Package III also included an airside construction workshop to improve
                                                                                     accessibility to open air yards and sites, which played a critical role in the timely

                                                                                     construction of Phase 4 by providing necessary materials. To secure loading areas
                                                                                     for materials related to electrical and machinery work, Terminal 2’s electrical
                                                                                     workshop and machinery workshop were built. Package III also included the
                                                                                     construction of solar power generation electricity room B and a fuel cell electric

                                                                                     room. The project was conducted from August 2022 to July 2024 with a budget of
                                                                                     around KRW 14.7 billion.


                                                                                     Establishing infrastructure for building operations: electricity,
                                                                                     communications, elevator systems for auxiliary buildings
                                                                                     After completing each auxiliary building, infrastructure including electricity and
                                                                                     communications facilities was built. Construction was divided into the T2 long-
                                                                                     term parking building and Main Substation C area. To secure communications

                                                                                     infrastructure and prevent fire, IIAC proceeded with information communications
                                                                                     construction and the purchase/installation of an automatic fire detection facility for
                                                                                     auxiliary buildings. Elevators for auxiliary buildings, refrigerating machines and
                                                                                     cooling towers, and a system to automatically control mechanical facilities were

                                                                                     installed.