Page 200 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 200

03


          Establishing facilities for

          maintenance and support


          for airport operation



















          Various auxiliary buildings are necessary for maintenance and support for continuous   original plan. As the construction site was on the roadside, the priority was on
          operation of airports. As the airport expanded with Phase 4, additional facilities for   safety, and a “smart safety management system” was implemented. This system
          maintenance and support were needed. Auxiliary buildings for Phase 4 were classified,   monitored the site using tools such as heavy-object fall detectors, mobile smart
          ordered, and proceeded into 4 packages for 33 buildings including facilities for the fire   CCTVs, and multi-gas detectors, with all data managed through the Innovative

          department, airport security, power generation, and power substations.  Monitoring on Smart (IMOS) platform. Another emphasis was on the exterior
                                                                                design of the building. To achieve a stereoscopic shape, each level had a different
          Constructing new parking building:                                    angle for structural components while a combination of steel and aluminum

          12 facilities including long-term parking building A                  elements provided visual variety. Each component was carefully numbered for
          The new long-term parking building at Terminal 2 was designed as an expansion   precise management, enabling material use to be minimized, thus reducing the
          to functionally link with the existing surface-level long-term parking lots. The   environmental impact.
          original plan was to remove 1,909 parking spaces from Long-term Parking Areas   PackageⅠ for the Phase 4 auxiliary buildings included other tasks along with
          D and E. However, to prevent interruptions to existing parking lot operations, the   the Long-Term Parking Building at Terminal 2 such as a valet parking office,

          plan was changed to remove only 971 parking spaces including from Long-term   convenient taxi facilities, bus route management office B, and the extension of
          Parking Area E, taxi stands, and unused land to prevent interruption. Thus, it was   Power Building C. The project was conducted from November 2020 to December
          possible to save the sunk cost and secure more than 500 parking spaces than the   2023 with a budget of around KRW 124.9 billion.




          198                                                                                                    The 30-year History of Incheon Airport Construction                                                                                                                                               199