Installing infrastructure for

                                              stable operations


































                                              Phase 3 auxiliary buildings                            Building has one underground story and 4 above-ground
                                              The construction of auxiliary buildings added details to   stories near Terminal 2, reflecting the needs of employees
                                              the frame of Phase 3. It began in November 2011, with   and operation providers. To harmonize with the passenger
                                              the construction of 11 buildings and 9 facilities on the   terminals, it has a futuristic design. The Apron Control Tower
                                              airside including Apron Control Tower 2, Power Building   2 was built to a height of 94.2 meters to eliminate blind spots

                                              C, Equipment Storage for Winter D, and 34 buildings and   and ensure it could play the role of main control tower during
                                              21 facilities on the landside including the 2nd IIAC Office   emergencies. The IT building is near the long-term parking
                                              Building, 2nd Joint Government Building, and IT building. The   lot and ramp to Terminal 2 for better accessibility while the
                                              project was divided into 7 packages and executed in 3 stages.   Power Building C was placed on the north of the Terminal

                                              The 2nd IIAC Office Building has one underground story and   2. The construction of the 45 auxiliary buildings reached its
                                              7 above-ground stories near the 1st IIAC Office Building,   first milestone with the completion of Package 1 in September
                                              which reduced the remodeling cost. The 2nd Joint Government   2016, and the entire project was completed in 2017.