Page 115 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 115

The core concept of Transportation Center 2 was to centralize transportation   open atmosphere with a glass roof, and the installation of solar power systems
               facilities near Terminal 2, enhancing convenience for airport users. Along with   moved the airport closer to becoming eco-friendly.  Several new technologies

               the rail station, previously dispersed facilities such as the short-term parking lot   and construction methods were applied throughout the project. The use of space
               and bus terminal were also integrated into the center. This adjustment brought the   frames improved the stability of the irregular, 3-dimensional steel structure.
               rail station closer to Terminal 2, making the transfer between different modes of   Additionally, the Direct Bolt System (DBS) method was applied to reduce the
               transportation much more seamless. The construction of Transportation Center   weight of steel joints, cutting down construction costs. 3-dimensional modeling

               2 began in June 2013 and was completed in October 2017. Inspired by the   was used to carefully review and precisely construct the complex 3-dimensional
               streamlined shape of an airplane, the center’s design embodies the image of a bird   curved surfaces of the Energy Core.
               taking flight through the concept of an Energy Core. The space features a bright,