Page 112 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 112

Making an eco-friendly airport,

          where nature, technology,


          and culture harmonize


















          Passenger Terminal 2                                  curbside. Considering the congestion at Terminal 1’s curbside,
          The construction of Passenger Terminal 2 was the core part   Terminal 2 placed its route bus terminal on the first basement

          of the Phase 3 project. Terminal 2 consists of 2 underground   level of Transportation Center 2, reducing curbside congestion.
          stories and 5 above-ground stories, with an overall design   This created a close-range, integrated public transportation
          inspired by the image of a soaring phoenix. It integrates   system, differentiating it from Terminal 1. During the Terminal
          nature-friendly (Green), eco-friendly (Eco), and cutting-  2 construction, the fast-track method, which combines design

          edge technology (Smart) concepts with traditional Korean   and construction phases, was employed along with full-
          culture (Culture) to reflect the identity of Incheon Airport.   responsibility supervision. Several innovative construction
          The terminal's design incorporates curves both inside and   techniques were also introduced. In the structural and exterior
          outside, complementing the existing facilities from Phases   work, the Mega Truss Travelling method was used to install the

          1 and 2, while creating a unique, differentiated space. A   massive roof trusses, while the large-scale louver system was
          streamlined transfer system was established by focusing on   applied for the first time in Korea to create a visually stunning
          transfer flows and specialized amenities, ensuring fast and   3-dimensional, curved ceiling in the check-in area. Above all,
          convenient passenger transfers. Additionally, commercial   IIAC focused on rigorous interface management to ensure the

          facilities were concentrated near the departure hall to enhance   project stayed on schedule. As a result, the construction of
          passenger convenience and maximize spatial efficiency.   Terminal 2 was successfully completed on time in June 2017.
          In particular, route bus stops were installed and operated




          110                                                                                                                                                                                                                                                                                                      111