Page 114 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 114

Convenient and comfortable eco-

          friendly transportation service















































          Transportation Center 2
          Transportation Center 2 was initially planned as a railway station in conjunction
          with the connection railway linking Terminal 1 and Terminal 2. However,

          through continuous feedback and expert consultations, the plan evolved into the
          creation of Transportation Center 2, integrating multiple transportation facilities
          including the railway.




          112
          112                                                                                                    The 30-y ear His t ory of Incheon Airport Cons truction                                                                                                                                           113
                                                                                                                 The 30-year History of Incheon Airport Construction
   109   110   111   112   113   114   115   116   117   118   119