Building roads to

          improve connectivity and


          accessibility






























          Phase 3 landside facility
          The Phase 3 landside facility construction project focused on the construction of
          roads and railways to provide equitable transportation service with Terminal 1. To
          this end, T2 access road was built to the north while roads and railways connecting
          Terminal 1 and Terminal 2 were built to the west. Construction started with the

          connecting railway for Terminal 2 in 2013, followed by southern access road, T1-
          T2 connecting road, improvement in airport entry junctions, roads and bridges
          for T2 curbside, and finished with T2 access road in 2017. T2 access road has 6
          to 8 lanes while T1-T2 connecting road has 4 lanes. The airport entry junction

          and parking lots were improved considering future traffic demand and scalability.
          Construction for curbside roads and bridges put an emphasis on design with the
          landscape and traditional curves.




          120                                                                                                    The 30-year History of Incheon Airport Construction                                                                                                                                               121