Page 121 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 121
Apron 2 consists of 37 attached stands, 19 remote stands, stands for Code F
aircraft (ultra-large), remote stands near the terminals, multi-purpose stands,
and the Multi Aircraft Ramping System (MARS). The IAT/BHS tunnel is an
underground structure designed to link various utilities including electricity,
communications, water supply, shuttle train, and BHS among Terminal 1,
Concourse, and Terminal 2. Phase 3 connected the existing structure with
Terminal 2. It is as long as 657.6 meters with a plan to build shuttle train stations
in the Terminal 2 Apron. Phase 3 included the taxilane bridge (R17) connecting
Runways 1 and 2 and Ground Support Equipment (GSE) bridge, which was
constructed for the first time in Korea. The design of the taxilane bridge was
inspired by the wings of an airplane and the GSE bridge by a Korean traditional
gateway.
118 119