Page 123 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 123
For the Terminal 2 connection railway construction, a shield Tunnel Boring Machine (TBM) method was
employed to build a tunnel that passes underground beneath the runway, avoiding a detour around it. This
project became the world's second successful case of tunnel construction carried out under an operational
airport. With the Phase 3 landside construction project, Incheon Airport completed the integrated
transportation system encompassing 2 passenger terminals.
120 PART.3 | Incheon Airport marching towards the future | Phase 3 construction project 121