Terminal 2 and auxiliary buildings were equipped with large indoor trees and biotopes. Terminal 2’s green areas are twice
          as large as Terminal 1’s. Phase 3 landscape construction was successful in terms of maximizing the green area, expanding

          pollution absorption sources, utilizing natural materials efficiently, creating eco-friendly ecological foundations, establishing
          breathing buildings, utilizing water resources, and creating a Green Way. All landscaping work was completed in December
          2017 for the grand opening, realizing an “airport within a park.”


























































          126                                                                                                    The 30-year History of Incheon Airport Construction                                                                                                                                               127