Terminal 2 and auxiliary buildings were equipped with large indoor trees and biotopes. Terminal 2’s green areas are twice
as large as Terminal 1’s. Phase 3 landscape construction was successful in terms of maximizing the green area, expanding
pollution absorption sources, utilizing natural materials efficiently, creating eco-friendly ecological foundations, establishing
breathing buildings, utilizing water resources, and creating a Green Way. All landscaping work was completed in December
2017 for the grand opening, realizing an “airport within a park.”