and improve the appearance while the inside was laminated to prevent rust. The earthquake-resistant design, while others had first grade, earthquake-resistant
gasoline station was classified based on the aircraft grade. For Code C aircraft design. IIAC also prevented customer complaints due to noise in advance by
using the Multi Aircraft Ramping System (MARS) at the apron, one gasoline minimizing vibration and noise. The construction of fuel storage facilities and
station was installed at the right side for flexible operation of the berthing apron. pipes was conducted from June 2020 to October 2024 and cost KRW 90.2 billion.
The monitoring system was linked and made compatible with the existing control
system.
Given the large volume of fuel stored, special attention was paid to safety. Fuel
supply facilities including storage tanks and pipe sleepers had a special grade,