Page 227 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 227

and improve the appearance while the inside was laminated to prevent rust. The   earthquake-resistant design, while others had first grade, earthquake-resistant

               gasoline station was classified based on the aircraft grade. For Code C aircraft   design. IIAC also prevented customer complaints due to noise in advance by
               using the Multi Aircraft Ramping System (MARS) at the apron, one gasoline   minimizing vibration and noise. The construction of fuel storage facilities and
               station was installed at the right side for flexible operation of the berthing apron.   pipes was conducted from June 2020 to October 2024 and cost KRW 90.2 billion.
               The monitoring system was linked and made compatible with the existing control

               system.
               Given the large volume of fuel stored, special attention was paid to safety. Fuel
               supply facilities including storage tanks and pipe sleepers had a special grade,




                                                                                                                                                    225
 224           P PART.4 | Achieving the 100-million-passenger era | Phase 4 construction project                                                    225
                                                      ons
                                                        truction pr
                                                               oject
                        ving the 100-million-pas
                ART.4 | Achie
                                              a | Phase 4 c
                                        senger er
   222   223   224   225   226   227   228   229   230   231   232