For the system integration tests, 14 groups were assigned to This large-scale national project involved an investment of
conduct 60 scenarios, ensuring full interoperability between KRW 2.9 trillion. As a result of the expansion, the number of
information and equipment systems. Similarly, the integrated runways increased from 2 to 3, and the passenger apron area
trial operations was carried out by 5 groups following 49 grew from 1.267 million square meters to 2.443 million square
scenarios under conditions identical to real-world operations. meters. The cargo terminal also doubled in size, reaching
After these rigorous preparations, IIAC held the grand opening 129,000 square meters. The project not only expanded the
ceremony for the Phase 2 construction project on June 20, airport’s size but also improved its services. From 2005 to 2007,
2008. Incheon Airport was named the “Best Airport in the World”
for 3 consecutive years by the Airports Council International
(ACI), demonstrating its status as one of the world’s top-tier
airports in terms of both facilities and services.
98 PART.2 | Bringing the world together in a larger space | Phase 2 construction project 99