Page 94 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 94

Building shuttle trains connecting

          Terminal and Concourse

































          The shuttle train was designed

          to transport passengers between
          the existing terminal and the new
          concourse. To avoid interference with
          aircraft movement on the ground, the

          system was installed underground. The
          shuttle train is the first fully automated
          rubber-tire light rail system in Korea,
          running along a 1.8-km underground

          track for a round trip. It was designed
          to transport up to 5,000 passengers per
          hour during peak times.




          92                                                                                                     The 30-year History of Incheon Airport Construction                                                                                                                                                93
   89   90   91   92   93   94   95   96   97   98   99