The Phase 2 construction area of Incheon Airport was located adjacent to the west of the Phase 1

              facility. Its original ground was marine soft ground. Ground improvement was necessary to ensure
              adequate support for aircraft takeoffs and landings. To achieve this goal, sand-mat, Plastic Board
              Drains (PBD), and pre-loading methods were used.


























































          76                                                                                                     The 30-year History of Incheon Airport Construction                                                                                                                                                77