Page 78 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 78
The Phase 2 construction area of Incheon Airport was located adjacent to the west of the Phase 1
facility. Its original ground was marine soft ground. Ground improvement was necessary to ensure
adequate support for aircraft takeoffs and landings. To achieve this goal, sand-mat, Plastic Board
Drains (PBD), and pre-loading methods were used.
76 The 30-year History of Incheon Airport Construction 77