Page 65 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 65

2000. The highlight of this construction project was undoubtedly the Yeongjong
               Bridge. The 550-meter, self-anchored suspension bridge section was the most
               challenging, featuring a double-deck design with a main span of 300 meters

               supported by 49 piers, accommodating both road and railway traffic. The
               107-meter-high main towers were built using the pneumatic caisson method,






 62            PART.1 | Opening new sky route on Yeongjong Island | Phase 1 construction project                                                     63
   60   61   62   63   64   65   66   67   68   69   70