Page 240 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 240

Projecting stars in the night sky: installing lighting                It produced the light effect with an open joint panel on the frontal side while
          Systematic lighting was installed focusing on the expanded area of Terminal   facade lighting was applied to the panel lines. The design gives an elegant and

          2 including the arrival hall, baggage claim area, arrival passage, check-in hall,   energetic look 24/7. The lighting control system is refined for real-time control
          departure passage, and gardens. In particular, the arrival hall has 13,120 LED   and monitoring through the lighting control unit of each electric room. When the
          objects. A building information modeling tool was utilized while lighting of   emergency generator is on, it will turn on the emergency lights. As an effort for
          900K to 5,700K offers refined adjustment. The dimming system automatically   ESG and carbon neutrality, Phase 4 integrated the Building Energy Management

          adjusts the illuminance. The landscape lighting was also upgraded. One example   System (BEMS) of Phase 3.
          is the lighting for the walkway canopy at Terminal 2 curbside. It was created as
          the representative night landmark under the theme of “stars in the night sky.”




          238                                                                                                    The 30-year History of Incheon Airport Construction                                                                                                                                               239
   235   236   237   238   239   240   241   242   243   244   245