Page 40 - 인천국제공항 4단계 건설사업 건설지 [브랜드북 영문]
P. 40
Preparing for the 100-million-passenger era
Phase 4 Construction of Runway 4 and Terminal 2 expansion 2017~2024
From construction planning to project management million passengers annually, covering an area of 734,000 square meters.
Accommodating 100 million passengers annually was the original Another critical task was the construction of Runway 4, essential for
goal outlined in 1992, when plans for the Seoul Metropolitan Area’s ensuring stable airport operations. Incheon Airport embarked on this
new airport were first conceived. That ambitious target was now on new phase with a well-organized construction plan and thorough project
the horizon. As Phase 3 construction neared completion at end-2015, management, aiming to establish itself as a global mega hub.
the airport began to prepare for the future to keep pace with rising
aviation demand. A primary goal was the expansion of Terminal 2, Construction of key Phase 4 airport facilities
increasing its capacity from 23 million passengers per year to 52 The Phase 4 project focused on both airside and landside areas, including
million. With Terminal 1 included, the total capacity would reach 106 the construction of Runway 4 and the expansion of Terminal 2. The