Page 38 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 38

Establishment of

          Korea Airport Construction Authority;


          development and revision to master plan







                                                                                After site selection, the basic design process began, as the government selected
                                                                                a consortium of Korea’s Yooshin Engineering Corporation and Bechtel from
                                                                                the US as the design project winner. The joint construction with an international

                                                                                company was aimed at promoting the localization and advancement of Korea’s
                                                                                future airport design technology. The Yooshin-Bechtel consortium conducted
                                                                                basic design from November 1990 to December 1991. Following this, domestic
                                                                                and international experts engaged in extensive discussions, consultations, and

                                                                                verification processes regarding the basic design. Based on this, the master
                                                                                plan for the Incheon Airport construction project was officially announced in
                                                                                June 1992. The Phase 1 master plan included the construction of the Passenger
                                                                                Terminal 1, capable of handling 170,000 flights and 27 million passengers per

                                                                                year, a runway, a dedicated expressway, and the foundations for an airport railway
                                                                                and a New Airport City, at a cost of KRW 3.416 trillion from 1992 to 1997. The
                                                                                plan also set a flexible schedule for later phases of construction, with the goal of
                                                                                eventually handling 100 million passengers per year.

                                                                                In September 1994, the government established the Korea Airport Construction
                                                                                Authority to move ahead with the project in earnest. The New Airport
                                                                                Construction Office established under the Korea Airports Authority (currently,

          Establishment of Korea Airport                                        Korea Airports Corporation), which was established in 1992, was separated into
          Construction Authority                                                an independent organization to ensure efficiency in the construction and operation
          1994.09.01.                                                           of the new airport. In 1999, the Korea Airport Construction Authority evolved

                                                                                into Incheon International Airport Corporation (IIAC), which successfully led the




          36                                                                                                     The 30-year History of Incheon Airport Construction                                                                                                                                                37