Page 182 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 182

02


          Expanding apron capacity

          for a more accommodating airport







          Achieving efficient and safe aircraft parking:        increased from 40 meters to 42.5 meters. This adjustment

          construction of the northern remote apron             provided an additional 5 meters of aircraft separation,
          To prepare for increasing aviation demand, the northern remote   enhancing flight safety. One of the highlights of the project

          apron was built to secure remote stands and de-icing stands   was the installation of Korea's first engine-on de-icing zone.
          in a timely manner. The northern remote apron consists of 5   This method allows for a significant reduction in de-icing time
          multi-purpose stands and 25 remote stands. The multi-purpose   compared to conventional methods. Furthermore, to maximize
          stands serve both as remote parking spaces and de-icing zones,   the space available for collecting wastewater and pollutants

          enhancing space utilization within the limited apron area.  generated during de-icing, the apron was designed with dual
          Additionally, MARS and taxiways exclusive to Code C aircraft   lanes. New stop line markings for pilots were introduced,
          were introduced at the northern remote apron. MARS allows   and lighting systems were installed to improve visibility and
          for the independent operation of 2 Code C aircraft in the space   nighttime operations.

          designed for one Code F aircraft, significantly improving   The construction of the northern remote apron was carried out
          airport operational efficiency.                       in 3 phases. Phase 1 construction began in June 2018, and 6
          During the construction of the northern remote apron,   stands were completed in April 2020. In Phase 2, 5 more stands
          proactive design modifications were made to ensure aviation   were completed in June 2021. The final phase concluded in

          safety. To minimize human errors, the layout was reviewed,   January 2022 with the completion of 17 additional stands.
          and the obstacle separation distance for Code E taxiways was















          180                                                                                                    The 30-year History of Incheon Airport Construction                                                                                                                                               181
   177   178   179   180   181   182   183   184   185   186   187