Page 48 - 인천국제공항 4단계 건설사업 건설지 [화보집 영문]
P. 48

Passenger Terminal 1,

          where technology and art meet








































          Alongside the civil engineering work, the construction of Passenger Terminal 1,   symbols, and artistic beauty. Inside, the terminal was equipped with cutting-
          the Transportation Center, and auxiliary buildings began in 1996. In particular,   edge automated systems. It represented a perfect combination of technology and

          Terminal 1 was the core facility of the Phase 1 construction project, showcasing   art. The exterior expresses the dynamic flow of air and water, and the mast of a
          Korea’s cutting-edge technology and cultural capabilities. With a total floor area   massive ship, creating a sense of rhythm and stability. Through this meticulous
          of 496,000 square meters, it was the single largest building in Korea at the time,   design and construction process, Incheon Airport’s Terminal 1 finally unveiled its
          and the construction cost amounted to about KRW 1.38 trillion. The design of   grand and beautiful structure at the end of February 2001.

          Terminal 1 was decided through an international design competition, combining
          modern architectural concepts with traditional Korean aesthetics. The exterior
          harmoniously integrated elements of traditional Korean cultural styles, national




          46
          46                                                                                                     The 30-y ear His t ory of Incheon Airport Cons truction                                                                                                                                            47
                                                                                                                 The 30-year History of Incheon Airport Construction
   43   44   45   46   47   48   49   50   51   52   53