Phase 3 Phase 4 Total
Terminal 2
expansion
overview
Floor area Annual passenger capacity Floor area Annual passenger capacity Floor area Annual passenger capacity
388,000㎡ 23 million 347,000㎡ 29 million 735,000㎡ 52 million
Phases 1 to 3 Phase 4 Total
Runway
Annual passenger capacity Annual passenger capacity
500,000 flights 600,000 flights
+
operational stability
Access and Preparing for traffic demand increase
Yeongjong- through expansion of T2 access road
connecting roads T1-T2 connecting road Shindo Peace
(4 lanes) Road (under
construction)
T2 access road
expanded
(from 6 lanes to 8)
Seoul (Yeongjong Bridge) Construction of T1-T2 connecting road
reduced travel time
(to 5 minutes on average)
T1 southern road Incheon (Incheon Bridge)
(1 lane)