Introduction of state-of-the-art

                                                                                     Baggage Handling System (BHS)































                                                                                     The BHS is a state-of-the-art facility that automatically transports all baggage
                                                                                     to each aircraft quickly and accurately. The detailed design was carried out

                                                                                     by Mannesmann, a German company that had designed BHSs for airports
                                                                                     worldwide, including Frankfurt and Sydney. The BHS installation was a massive
                                                                                     project, involving the laying of more than 750 km of cable and the installation of
                                                                                     thousands of pieces of equipment, along with approximately 21 km of conveyors

                                                                                     throughout the spacious Terminal 1. The installation of the conveyors, in
                                                                                     particular, seemed almost impossible given the extensive piping, air conditioning
                                                                                     ducts, power cables, and communication networks, the largest of their kind in the
                                                                                     country. However, thanks to the dedicated efforts of all involved, the installation

                                                                                     was completed on schedule. From April 2000, commissioning was followed by
                                                                                     acceptance tests starting in July of the same year, with everything successfully
                                                                                     completed by the end of the year.